My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spillis Candela
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(01-07-01) Architectural Design Svcs.
>
Spillis Candela
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:33:26 AM
Creation date
12/28/2010 2:26:10 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Architectural Design
Bid No. (xx-xx-xx)
01-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sauey Isles Beach <br />O NAVFAC -IQC, Caribbean, Principal in Charge for a <br />Indefinite Delivery Contract for Architectural, Engineer- <br />ing and Interior Design services for U.S. Army facility <br />located throughout the Caribbean. <br />O United States Department of Agriculture, Indefi- <br />nite Delivery Contract, South Florida and the Florida <br />Keys. Pricipal in Charge for an Indefinite Delivery Con - <br />tractfor architectural, engineering, planning, and inte- <br />rior design services for up to a 3 year time frame in <br />the geographic region of South Florida and the Florida <br />Keys. During the course of this contract, SCP has <br />been responsible for a variety of planning /feasibility <br />studies and miscellaneous A/E projects. <br />O Signature Flight Support, Miami, FL. New termi- <br />nal, This project called for the conceptual design and <br />master plan of a new terminal and hangar complex to <br />be phased in during 1996. Construction will take place <br />on an existing site adjacent to the newly proposed <br />runway on the north side of the airport. The project <br />also included a two -bay vehicle maintenance facility <br />and provision for a future hangar for small, narrow - <br />body jets. Project construction will be phased and <br />demolition of existing facility will be sequenced to <br />maintain continuous operations of existing facilities. <br />O Charlotte County Central Library Facility, Port <br />Charlotte, Florida. A 35,000 SF Central Library for <br />Charlotte County which will be located in Port Char- <br />lotte on the County's Administration Center site. The <br />proposed site has a park -like setting and is adjacent <br />to a lake. In addition to providing comprehensive <br />design services, Spillis Candela DMJM is also respon- <br />sible for the overall master plan of the County's Branch <br />Library System and the programming and space plan- <br />ning for the new Central Library project. <br />Memberships <br />O Greater Miami Chamber of Commerce <br />O Beacon Council <br />71 Coral Gables Chamber of Commerce <br />O The Rotary Club of Miami <br />O National Association of Industrial Office Parks (NAIOP) <br />O National Association of Corporate <br />Real Estate Executives <br />Spillis Candela DM1M <br />
The URL can be used to link to this page
Your browser does not support the video tag.