My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 02-04-01 Sidewalk Improv. on Atlantic Blvd.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:00:33 AM
Creation date
1/5/2011 3:21:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sidewalk Improv. Atlantic Blvd.
Bid No. (xx-xx-xx)
02-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.8; REMEDIES FOR BREACH: Should Contractor fail to perform, City Shall notify Contractor in writing of such <br />failure to perform and Contractor shall have thirty (30) days of receiving such notice to cure such failure. If Contractor <br />is unable to cure such failure to perform then City shall receive a refund equal to the actual cost of a third party to cure <br />such failure. The City may sue for damages in circuit court. If City fails, refuses or is unable to perform any term of this <br />agreement, City shall pay for services rendered as of the date of termination. <br />8.9: ATTORNEY'S FEES: If this matter is placed in the hands of an attorney for collection, or in the event suit or action <br />is instituted to enforce any of the terms or conditions of this agreement, the losing party shall pay to the prevailing party, <br />in such suit or action in both trial court and appellate court, together with reasonable attorney's fees for the anticipated <br />cost of collection and judgement enforcement. <br />00210-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.