My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 02-04-01 Sidewalk Improv. on Atlantic Blvd.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:00:33 AM
Creation date
1/5/2011 3:21:19 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sidewalk Improv. Atlantic Blvd.
Bid No. (xx-xx-xx)
02-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
site. <br />6.3 The CONTRACTOR will furnish all materials, equipment, labor, transportation, construction equipment and <br />machinery, tools, appliances, fuel, power, light, heat, local telephone, water and sanitary facilities and all other facilities <br />and incidentals necessay for the execution, testing, initial operation and completion of the Work- <br />6A All materials and equipment will be new, except as otherwise provided in the Contract Documents. When special <br />makes or grades of material which are normally packaged by the supplier or manufacturer are specified or approved, such <br />materials shall be delivered to the site in their original packages or containers with seals unbroken and labels Intact. <br />6.5 All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in <br />accordance with the instructions of the applicable manufacturer, fabricator, or processors, except as otherwise provided <br />in the Contract Documents. <br />Materials. Eauioment. Products and Substitutions <br />6.6 Materials, equipment and products incorporated in the Work must be approved for use before being purchased by <br />the CONTRACTOR The CONTRACTOR shall submit to the CITY a list of proposed materials, equipment or products, <br />together with such samples as may be necessary for them to determine their acceptability and obtain their approval, within <br />ninety (90) calendar days after award of Contract unless otherwise stipulated in the Special Conditions. No request for <br />payment for "or equal" equipment will be approved until this list has been received and approved by the CITY. <br />6.6.1 Whenever a material, article or piece of equipment is identified on the Drawings or Specifications by <br />reference to brand name or catalog number, it shall be understood that this is referenced for the purpose of defining <br />the performance of other salient requirements, and that other products of equal capacities, quality and function shall <br />be considered. The CONTRACTOR may recommend the substitution of a material, article, or piece of equipment <br />of equal substance and function for those referred to in the Contract Documents by reference to brand name or <br />catalog number, and if, in the opinion of the CONSULTANT, such material, article, or piece of equipment is of <br />equal substance and fimction to that specified, the CONSULTANT may approve its substitution and use by the <br />CONTRACTOR Incidental changes or extra component parts required to accommodate the substitute will be made <br />by the CONTRACTOR without a change in the Contract Price or the Contract Time. <br />6.6.2 No substitute shall be ordered or installed without the written approval of the CONSULTANT who shall be <br />the judge of quality. <br />6.6.3 Delay caused by obtaining approvals for substitute materials will not be considered justifiable grounds for <br />an extension of construction time. <br />6.6.4 Should any Work or materials, equipment or products not conform with requirements of the Drawings and <br />Specifications or become damaged during the progress of the Work, such Work or materials shall be removed and <br />replaced, together with any Work disarranged by such alterations, at any time before completion and acceptance <br />of the Project. All such Work shall be done at the expense of the CONTRACTOR- <br />6.6.5 No materials or supplies for the Work shall be purchased by the CONTRACTOR or any Subcontractor <br />subject to any chattel mortgage or under a conditional sale or other agreement by which an interest is retained by <br />the Seller. The CONTRACTOR warrants that they have good title to all materials and supplies used by them in the <br />Work. <br />Concerning Subcontractors <br />6.7 The CONTRACTOR will not employ any Subcontractor, against whom the CITY or the CONSULTANT may have <br />reasonable objection, nor will the CONTRACTOR be required to employ any Subcontractor who has been accepted by <br />00710-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.