Laserfiche WebLink
site. <br />6.3 The CONTRACTOR will furnish all materials, equipment, labor, transportation, construction equipment and <br />machinery, tools, appliances, fuel, power, light, heat, local telephone, water and sanitary facilities and all other facilities <br />and incidentals necessay for the execution, testing, initial operation and completion of the Work- <br />6A All materials and equipment will be new, except as otherwise provided in the Contract Documents. When special <br />makes or grades of material which are normally packaged by the supplier or manufacturer are specified or approved, such <br />materials shall be delivered to the site in their original packages or containers with seals unbroken and labels Intact. <br />6.5 All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in <br />accordance with the instructions of the applicable manufacturer, fabricator, or processors, except as otherwise provided <br />in the Contract Documents. <br />Materials. Eauioment. Products and Substitutions <br />6.6 Materials, equipment and products incorporated in the Work must be approved for use before being purchased by <br />the CONTRACTOR The CONTRACTOR shall submit to the CITY a list of proposed materials, equipment or products, <br />together with such samples as may be necessary for them to determine their acceptability and obtain their approval, within <br />ninety (90) calendar days after award of Contract unless otherwise stipulated in the Special Conditions. No request for <br />payment for "or equal" equipment will be approved until this list has been received and approved by the CITY. <br />6.6.1 Whenever a material, article or piece of equipment is identified on the Drawings or Specifications by <br />reference to brand name or catalog number, it shall be understood that this is referenced for the purpose of defining <br />the performance of other salient requirements, and that other products of equal capacities, quality and function shall <br />be considered. The CONTRACTOR may recommend the substitution of a material, article, or piece of equipment <br />of equal substance and function for those referred to in the Contract Documents by reference to brand name or <br />catalog number, and if, in the opinion of the CONSULTANT, such material, article, or piece of equipment is of <br />equal substance and fimction to that specified, the CONSULTANT may approve its substitution and use by the <br />CONTRACTOR Incidental changes or extra component parts required to accommodate the substitute will be made <br />by the CONTRACTOR without a change in the Contract Price or the Contract Time. <br />6.6.2 No substitute shall be ordered or installed without the written approval of the CONSULTANT who shall be <br />the judge of quality. <br />6.6.3 Delay caused by obtaining approvals for substitute materials will not be considered justifiable grounds for <br />an extension of construction time. <br />6.6.4 Should any Work or materials, equipment or products not conform with requirements of the Drawings and <br />Specifications or become damaged during the progress of the Work, such Work or materials shall be removed and <br />replaced, together with any Work disarranged by such alterations, at any time before completion and acceptance <br />of the Project. All such Work shall be done at the expense of the CONTRACTOR- <br />6.6.5 No materials or supplies for the Work shall be purchased by the CONTRACTOR or any Subcontractor <br />subject to any chattel mortgage or under a conditional sale or other agreement by which an interest is retained by <br />the Seller. The CONTRACTOR warrants that they have good title to all materials and supplies used by them in the <br />Work. <br />Concerning Subcontractors <br />6.7 The CONTRACTOR will not employ any Subcontractor, against whom the CITY or the CONSULTANT may have <br />reasonable objection, nor will the CONTRACTOR be required to employ any Subcontractor who has been accepted by <br />00710-9 <br />