My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />G. Inspect all plant material for insect /disease problems. Take appropriate <br />action before loading to ensure all plant material is free of any harmful <br />insect /disease problem. This precaution does not preclude rejection at <br />the site. Apply pesticides in strict accordance with manufacturer's <br />recommendations and all government standards. <br />H. Plant material shall be handled only in ways and means accepted by <br />the industry and approved by the Landscape Architect. <br />I. Plant n at material be edh day dug. tion of <br />planting pits or beds be coordinated o nsurehs schedule. <br />3.02 PLANTING <br />A. Tree Spade Material: <br />1 . Plant materials that are tree spaded and are relocated to areas <br />accessible by tree spade equipment shall be planted in tree <br />spaded planting pits as required. <br />2. Plant materials that are tree spaded and are relocated to areas <br />that are not accessible by tree spade equipment shall be planted <br />according to procedures described for new plant materials in <br />Section 02490. <br />3. Contractor shall continue watering and caring for relocated <br />material as described in paragraph 3.04 and as described for <br />new material, Section 02490. <br />B. Hand Dug Material: to <br />1. Relocated plant material shall be planted Section according <br />procedures described for new material, <br />Additionally, terrasorb shall be added to backfill. <br />2. Contractor shall continue watering and caring for relocated <br />material as described in paragraph 3.04 and as described for <br />new material, Section 02490. Relocated material which oes <br />not survive shall be replaced with equal canopy at no <br />the Owner. <br />3.03 FERTILIZER <br />A. Relocated plant materials shall be fertilized immediately after <br />transplanting. <br />B. Fertilizer shall be applied according to procedures described for new <br />materials, 02484 and 02490. <br />3.04 STAKING AND GUYING <br />A. Designated material shall be staked and guyed according to procedures <br />described for new plant materials, Section 02490. <br />1 09/03 02481 -7 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.