My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />SECTION 16050 <br />' ELECTRICAL <br />PART 1 -GENERAL <br />1.01 SCOPE OF WORK <br />A. Furnish all labor, materials, equipment and incidentals required for a complete <br />electrical system for the City of sunny Isles Entry Features for the City of <br />Sunny Isles, Florida, (typical of 3) as hereinafter specified and shown on the <br />' Drawings. <br />B. The Work, apparatus and materials which shall be furnished under these <br />Specifications and accompanying Drawings shall include all items listed <br />hereinafter and /or shown on the Drawings. Certain equipment which will <br />require wiring thereto and /or complete installation is indicated. All materials <br />necessary for the complete installation shall be furnished and installed by the <br />CONTRACTOR to provide complete power, lighting, wiring and control <br />systems as indicated on the Drawings and /or as specified herein. <br />C. The CONTRACTOR shall furnish and install the necessary cables, protective <br />devices, conductors, supports, raceways, exterior electrical system, etc., to <br />serve lighting loads and miscellaneous electrical loads as indicated on the <br />Drawings and /or as specified. <br />D. The work shall include complete testing of all equipment and wiring at the <br />completion of the work and making any minor connection changes or <br />adjustments necessary for the proper functioning of the system and <br />equipment. All workmanship shall be of the highest quality; sub - standard <br />work will be rejected. <br />E. Each bidder or his authorized representatives shall, before preparing his <br />proposal, visit all areas of the existing buildings and structures in which work <br />under this Section is to be performed and inspect carefully the present <br />installation. The submission of the proposal by this bidder shall be considered <br />' evidence that he or his representative has visited the buildings and noted the <br />locations and conditions under which the work will be performed and that he <br />takes full responsibility for a complete knowledge of all factors governing his <br />' work. <br />F. All power interruptions to existing equipment shall be at the CITY °s <br />' convenience. Each interruption shall have prior approval. <br />G. It is the intent of these Specifications that the electrical system shall be <br />suitable in every way for the service required. All material and all work which <br />1 09/03 16050 -1 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.