My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. The ratings of electrically operated devices together with the size shown for <br />their branch of circuit conductors and conduits are approximate only and are <br />' indicative of the probable power requirements insofar as they can be <br />determined in advance of the purchase of equipment. <br />J. All connections to equipment shall be made as shown, specified and directed <br />and in accordance with the approved shop drawings, regardless of the number <br />of conductors shown on the Electrical Drawings. <br />' <br />1.07 RECORD DRAWINGS <br />' A. As the work progresses, legibly record all field changes on a set of project <br />Contract Drawings. When the project is complete, furnish a complete set of <br />reproducible "As- built" drawings for the Project Record Documents. <br />1.08 SHOP DRAWINGS <br />A. As specified under other Sections, shop drawings shall be submitted for <br />approval for all materials, equipment, apparatus, and other items as required by <br />the Engineer. <br />B. Shop drawings shall be submitted for the following equipment: <br />1. Disconnect switch <br />2. Lighting contactor <br />' 3. Panelboards <br />4. Wire & cable <br />1 5. Pull Boxes <br />6. Landscape light fixture <br />7. Jack and bore casings as per specification section 16200 <br />C. The Manufacturer's name and product designation and catalog cutsheets shall <br />be submitted for the following material: <br />1. Conduit <br />2. Boxes and fittings <br />3. Control relays <br />4. Precast Concrete Pull Boxes <br />' D. Prior to submittal by the CONTRACTOR, all shop drawings shall be checked <br />for accuracy and contract requirements. Shop drawings shall bear the date <br />checked and shall be accompanied by a statement that the shop drawings <br />' have been examined for conformity to Specifications and Drawings. This <br />statement shall also list all discrepancies with the Specifications and Drawings. <br />Shop drawings not so checked and noted shall be returned. <br />' 09/03 16050 -4 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.