My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. An air pressure test for leaks shall be conducted in the presence of the <br />Engineer or his representative immediately upon completion of each <br />crossing at a minimum test pressure of 20 psig. The test shall be <br />abandoned, if in the opinion of the Engineer, the leaks are potentially <br />damaging to the roadway. <br />PART 8 - REPORTING PROCEDURES <br />8.01 GENERAL <br />A. An accurate log shall be kept by the CONTRACTOR or authorized <br />representative on the crossing. The purpose of this log is to record and <br />report the data necessary to isolate and identify all common factors <br />associated with underground crossing failures. <br />B. The log shall be forwarded to the Engineer with the permit, subsurface <br />investigation report, dewatering plan (if applicable), completion notice, <br />and related correspondence. <br />C. The data shall be recorded on the job site during the actual crossing <br />operation. <br />END OF SECTION <br />09/03 16200 -18 03- 1438.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.