My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:44:35 AM
Creation date
1/6/2011 10:58:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />t <br />1 <br />SECTION 16200 <br />JACK AND BORE <br />PART 1 -GENERAL <br />1.01 SCOPE OF WORK <br />A. Work included in this section consists of furnishing all equipment, <br />materials and labor required for the installation of complete jack and bore <br />casings, and all appurtenances as specified on the drawings and <br />specifications for the Florida Department of Transportation. <br />11 1.02 GOVERNMENTAL AGENCIES <br />A. All work shall conform to the applicable standards of the Florida <br />Department of Transportation. <br />1.03 SUBMITTALS <br />is A. The Contractor shall submit shop drawings of all casings, pipe, pipe <br />fittings to be used for construction of jacking and boring. <br />1! <br />1.04 MEASUREMENT AND PAYMENT <br />iiA. Measurement and payment will be based upon work completed and <br />accepted in accordance with the plans and specifications. No separate <br />payment will be made for excavation, trenching, backfilling, leakage tests <br />or other incidental items of work not authorized by the Engineer, in <br />writing, as extra work. <br />1.05 GUARANTEE <br />j� 07/03 <br />0 <br />A. The Contractor shall guarantee all materials and equipment furnished and <br />installed, and all work performed for a period of one (1) year from the <br />date of substantial completion. The guarantee shall stipulate that the <br />completed system is free from all defects due to faulty materials or <br />workmanship and the Contractor shall promptly make such corrections as <br />may be necessary by reason of such defects including the repairs of any <br />damage to other parts of the system resulting from such defects. <br />16200 -1 03- 1438.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.