Laserfiche WebLink
!l <br />t <br />t <br />t <br />Ll <br />necessary for various related tasks) must be on the job site at the <br />beginning work. A competent and experienced supervisory representing <br />the contractor that is thoroughly familiar with the equipment and type of <br />work to be performed, must be in direct charge and control of the <br />operation at all times. In all cases the supervisor must be continually <br />present at the job site during the actual crossing operation. <br />PART 5 - INSTALLATION <br />5.01 GENERAL <br />1 07/03 <br />A. Erection or Installation of Appropriate Safety and Warning Devices - <br />Erection or installation of appropriate safety and warning devices shall be <br />completed prior to beginning work. <br />B. Subsurface Soil and Drainage Investigation - In general, the greatest <br />influences on the success or failure of an underground crossing are the <br />existing subsurface soil and water conditions. To correctly plan individual <br />crossing procedures such as dewatering, use of cutting heads, <br />positioning of auger within the casing and to accurately locate potential <br />problem areas, subsurface investigation must be made by the permittee <br />or his contractor. <br />C. Dewatering - Evacuation of ground and surface water from jacking and <br />receiving pits and from path of proposed crossing. Where the ground <br />water level is above the invert of the proposed crossing, or above the <br />floor level of the jacking pits, dewatering is necessary to reduce the <br />water level to below the jacking pit floors and the invert of the proposed <br />crossing, and must be designed, installed and in operation prior to <br />beginning the crossing as follows: <br />1) Except where rock is present throughout the length of the bore <br />and no likelihood of sand pockets exists. <br />2) Where the existing ground water level and particular soil type <br />involved indicates that excessive flowback of spoil material as the <br />jacking progresses is likely. <br />Dewatering shall not be necessary where remote - powered <br />hydraulic equipment is used to make the crossing underwater. <br />16200 -8 <br />03- 1438.A <br />