My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rE. Data on materials and equipment include, without limitation, materials and <br />equipment lists, catalog data sheets, cuts, performance curves, diagrams, <br />materials of construction and similar descriptive material. Materials and <br />equipment lists shall give, for each item thereon, the name and location of <br />the supplier or manufacturer, trade name, catalog reference, size, finish <br />and all other pertinent data. <br />F. For all mechanical and electrical equipment furnished, the Contractor shall <br />provide a list including the equipment name, address and telephone <br />' number of the manufacturer's representative and service company so that <br />service and spare parts can be readily obtained. In addition, a <br />maintenance and lubrication schedule for each piece of equipment shall <br />be submitted along with each shop drawing submittal. <br />' G. All manufacturers or equipment supplier who propose to furnish <br />equipment or products under Divisions 11, 12, 13, 14, 15, and 16 shall <br />submit an installation list to the Engineer along with the required shop <br />' drawings. The installation list shall include at least five installations where <br />indentical equipment has been installed and has been in operation for a <br />period of at least one (1) year. <br />H. Only the Engineer will utilize the color "red" in marking Shop Drawing <br />submittals. <br />I. Before final payment is made, the Contractor shall furnish to Engineer two <br />(2) sets of record shop drawings all clearly revised, complete and up to <br />' date showing the permanent construction as actually made for all <br />reinforcing and structural steel, miscellaneous metals, process and <br />mechanical equipment, yard piping, electrical system, and instrumentation <br />system. <br />1.06 WORKING DRAWINGS <br />A. When used in the Contract Documents, the term "working drawings" shall <br />be considered to mean the Contractor's plans for temporary structures <br />such as temporary bulkheads, support of open cut excavation, support of <br />utilities, ground water control systems, forming and false -work; for <br />underpinning; and for such other work as may be required for <br />construction, but does not become an integral part of the project. <br />B. Copies of working drawings as noted in subparagraph 1.06A above, shall <br />rbe submitted to the Engineer where required by the Contract Documents <br />or requested by the Engineer, and shall be submitted at least thirty (30) <br />calendar days (unless otherwise specified by the Engineer) in advance of <br />rtheir being required for work. <br />05/04 01340 -5 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.