My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />[l <br />1 <br />L <br />7 <br />1.10 WARRANTY <br />proper lubrication and to avoid metal -to -metal "welding ". Upon <br />installation of the equipment, the Contractor shall start the <br />equipment, at least half load, once weekly for an adequate period of <br />time to insure that the equipment does not deteriorate from lack of <br />use. <br />Lubricants shall be changed upon completion of installation and as <br />frequently as required thereafter during the period between <br />installation and acceptance. Mechanical equipment to be used in <br />the work, if stored for longer than ninety (90) days, shall have the <br />bearings cleaned, flushed and lubricated prior to testing and start up, <br />at no extra cost to the Owner. <br />Prior to acceptance of the equipment, the Contractor shall have the <br />manufacturer inspect the equipment and certify that its condition has <br />not been detrimentally affected by the long storage period. Such <br />certifications by the manufacturer shall be deemed to mean that the <br />equipment is judged by the manufacturer to be in a condition equal <br />to that of equipment that has been shipped, installed, tested and <br />accepted in a minimum time period. As such, the manufacturer will <br />guarantee the equipment equally in both instances. If such a <br />certification is not given, the equipment shall be judged to be <br />defective. It shall be removed and replaced at the Contractor's <br />expense. <br />A. For all major pieces of equipment, submit a warranty from the equipment <br />manufacturer as specified in the specification section for that equipment, if <br />none is indicated then Section 01030. <br />1.11 SPARE PARTS <br />A. Spare parts for certain equipment provided under Division 11 through 16 <br />have been specified in the pertinent sections of the Specifications. The <br />Contractor shall collect and store all spare parts so required in an area to be <br />designated by the Engineer. In addition, the Contractor shall furnish to the <br />Engineer an inventory listing all spare parts, the equipment they are <br />associated with, the name and address of the supplier, and the delivered <br />cost of each item. Copies of actual invoices for each item shall be <br />furnished with the inventory to substantiate the delivered cost. <br />1.12 GREASE, OIL AND FUEL <br />05/04 <br />A. All grease, oil and fuel required for testing of equipment shall be furnished <br />with the respective equipment. The Owner shall be furnished with a year's <br />supply of required lubricants including grease and oil of the type <br />recommended b the manufacturer with each item of the equipment supplied <br />under Division 11 through 16. <br />01600 -7 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.