Laserfiche WebLink
G. It is the intent of these Specifications that the electrical system shall be suitable <br />in every way for the service required. All material and all work which may be <br />reasonably implied as being incidental to the work of this Section shall be <br />furnished at no extra cost. <br />' H. Furnish and install a complete underground stem as herein specified and shown <br />p g Y p <br />on the drawings. <br />1.02 SERVICE AND METERING <br />A. Permanent electrical power will be provided by Florida Power & Light Company <br />at voltages indicated on the drawings. The CONTRACTOR shall furnish and <br />install one new metered service as per Florida Power & Light Company <br />direction. <br />B. The CONTRACTOR shall furnish and install the service riser, secondary conduit <br />and wire from the service point to the service entrance equipment. The <br />CONTRACTOR is responsible for confirming this distance with the power <br />company prior to bid time. The power company contact is Mr. Alex Martinez, <br />phone (305) 770 -7928. <br />1.03 CODES, INSPECTION AND FEES <br />A. All material and installation shall be in accordance with the latest edition of the <br />National Electrical Code and all applicable national, local and state codes, laws <br />and ordinances. <br />I a <br />1 <br />1 <br />I <br />Pay all fees required for permits and inspections including any charges <br />associated with the service modifications. <br />1.04 TESTS <br />1 05/04 <br />Ll <br />A. Test all systems and repair or replace all defective work. Make all necessary <br />adjustments to the systems and instruct CITY's personnel in the proper <br />operation of the systems. <br />B. The following minimum tests and checks shall be made prior to the energizing <br />of electrical equipment. Test shall be by the CONTRACTOR and a certified <br />test report shall be submitted providing all test results and stating that the <br />equipment meets and operates in accordance with the Manufacturer's and job <br />specifications, and that equipment and installation conforms to all applicable <br />Standards and Specifications: <br />1 . Testing of protective relays for calibration and proper operation. <br />160501 -2 <br />03 -4465 <br />