My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2. Test all 600 volt wire insulation with a megohm meter after installation. <br />Make tests at not less than 1000 volts. Submit a written test report of <br />the results to the engineer. <br />3. Mechanical inspection of all circuit breakers to assure proper operation. <br />C. The Engineer shall be notified forty-eight (48) hours before tests are made to <br />g <br />enable the City to have designated personnel present. <br />1.05 INTERPRETATION OF DRAWINGS <br />A. The Drawings are not intended to show exact locations of conduit runs. <br />B. All three -phase circuits shall be run in separate conduits unless otherwise <br />shown on the Drawings. <br />C. Unless otherwise approved by the Engineer, conduit shown exposed shall be <br />installed exposed; conduit shown concealed shall be installed concealed. <br />' D. Where circuits are shown as "home- runs," all necessary fittings and boxes <br />shall be provided for a complete raceway installation. <br />E. The CONTRACTOR shall harmonize the work of the different trades so that <br />interferences between conduits, piping, equipment, architectural and structural <br />work will be avoided. All necessary offsets shall be furnished so as to take up <br />a minimum space and all such offsets, fittings, etc., required to accomplish <br />this shall be furnished and installed by the CONTRACTOR without additional <br />expense to the CITY. In case interference develops, the Owner's authorized <br />representative is to decide which equipment, piping, etc., must be relocated, <br />regardless of which was installed first. <br />F. Verify with the Engineer the exact locations and mounting heights of lighting <br />fixtures, switches and receptacles prior to installation. <br />G. The locations of equipment, fixtures, outlets, and similar devices shown on the <br />Drawings are approximate only. Exact locations shall be as approved by the <br />Engineer during construction. Obtain in the field all information relevant to the <br />placing of electrical work and in case of any interference with other work, <br />proceed as directed by the Engineer and furnish all labor and materials <br />necessary to complete the work in an approved manner. <br />H. Circuit layouts shown are not intended to show the number of fittings, or other <br />installation details. Furnish all labor and materials necessary to install and <br />place in satisfactory operation all power, lighting, and other electrical systems <br />' shown. Additional circuits shall be installed wherever needed to conform to <br />the specific requirements of the equipment. <br />05/04 160501 -3 03 -4465 <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.