My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. All wiring in panelboards shall be neatly formed, grouped, laced, <br />and identified to provide a neat and orderly appearance. A <br />typewritten directory card identifying all circuits shall be placed in <br />the card holder inside the front cover. <br />2.05 UNDERGROUND SYSTEM <br />A. Materials <br />1 . Ducts shall be polyvinyl chloride (PVC Schedule 80) installed on <br />clean fine sand. No rocks or debris shall be allowed as trench fill. <br />2. Cable racks, supports, pulling -in irons, and hardware shall be <br />galvanized steel manufactured by Cope or approved equal, or <br />provided as required. <br />3. Precast pullboxes shall be heavy duty type, designed for a Class <br />H2O wheel load. Precast pullboxes shall be as manufactured by <br />Brooks Products Co., or approved equal. <br />4. Handhole covers and frames shall be traffic rated, H2O class, <br />provided as required and grounded to the system ground. <br />B. Ducts shall be installed to drain away from panels; ducts between <br />pullboxes shall drain toward the pullbox. Duct slopes shall not be less <br />than 3 inches per 100 feet. <br />C. Duct lines shall be laid in trenches on a clean backfill bedding. <br />D. The minimum cover for duct lines shall be as specified. <br />E. PVC duct terminations at pullboxes shall be with PVC and bells. <br />F. Where bends in ducts are required, long radius elbows, sweeps and <br />offsets shall be used. <br />1 . All ducts shall be rodded and a mandrel drawn through followed by <br />a swab to clean out any obstructions which may cause cable <br />abrasions. The mandrel shall be 12 inches in length and the <br />diameter '/2 -inch less than the inside diameter of the duct. <br />2. Spare ducts shall be plugged and sealed watertight at all <br />pullboxes. <br />05/04 160501 -8 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.