My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />B. Environmental Performance: In order to secure approval to proceed with <br />construction, the Owner committed to comply with terms of an <br />Environmental Impact Statement. A copy of this Statement shall be <br />transmitted to the Contractor prior to execution of the Owner - Contractor <br />Agreement. The Project has been designed and the Contract Documents <br />prepared with the intention that resulting Work will comply with terms of <br />that Statement. <br />1. Before Substantial Completion inspect, test and adjust <br />performance of every system or facility of the Work to ensure <br />satisfactory overall performance <br />2. No later than 30 days after Owner occupancy and use of the <br />Project, return and again inspect, test and adjust the Work. <br />3. Submit a report of results to the Owner. <br />4. Instruct the Owner's operating personnel on operational <br />requirements needed to maintain compliance. <br />5. Report performance of completed installations after adjustment that <br />appear unable to comply with the requirements. <br />1.05 SUBMITTALS <br />A. General: Coordinate preparation and processing of submittals with <br />performance of construction activities. Transmit each submittal <br />sufficiently in advance of performance of related construction activities to <br />avoid delay. <br />B. Progress Schedule: Fully developed, horizontal bar chart type <br />Contractor's construction schedule. Revise the schedule after each <br />meeting or activity, where revisions have been recognized or made. Issue <br />updated schedules monthly. <br />C. Daily Construction Report: Record of construction activities and events at <br />the site; submit two (2) copies to the Engineer at weekly intervals. <br />D. Shop Drawings: Newly prepared information, drawn to accurate scale. <br />Do not reproduce Contract Documents or copy standard information as <br />the basis of Shop Drawings. Standard information prepared without <br />specific reference to the Project is not considered Shop Drawings. <br />1. Shop Drawings shall include fabrication and installation drawings, <br />setting diagrams, schedules, patterns, templates and similar <br />drawings. <br />2. Do not use Shop Drawings without an appropriate final stamp <br />indicating action taken in connection with construction. <br />01015 -2 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.