My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Horsepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Responses
>
Horsepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 11:56:53 AM
Creation date
1/10/2011 10:15:02 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
NE 159TH ST. & NE 174TH ST. Roadwyay Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1.07 <br /> <br />07/04 <br /> <br />deficiencies noted in previously transmitted written notice and debut the <br />cost associated with these corrections from the Contractor's Contract. <br />These costs may be comprised of expenditures for labor, equipment usage, <br />administrative, clerical, engineering and any other costs associated with <br />making the necessary corrections. <br /> <br />SUBSTITUTIONS AND PRODUCT OPTIONS <br /> <br />A. Contractor's Options: <br /> <br />1. For Products specified only by reference standard, select any <br />product meeting that standard. <br />2. For Products specified by naming several products or <br />manufacturers, select anyone of the products or manufacturers <br />named, which complies with the specifications. <br />3. For products specified by naming one or more Products or <br />manufacturers and "or equal", Contractor must submit a request as <br />for substitutions for any Product or manufacturer not specifically <br />named. <br /> <br />B. Substitutions: <br /> <br />1. For a period of 30 days after the effective date of the Agreement, the <br />Engineer will consider written requests from Contractor for <br />substitution of Products. <br />2. Submit a separate request for each Product, supported with <br />complete data, with drawings and samples as appropriate, including: <br />a. Comparison of the qualities of the proposed substitution with <br />that specified <br />b. Changes required in other elements of the work because of <br />the substitution <br />c. Effect on the construction schedule <br />d. Cost data comparing the proposed substitution with the <br />Product specified <br />e. Any required license fees or royalties <br />f. Availability of maintenance service, and source of <br />replacement materials <br /> <br />3. The Engineer shall be the judge of the acceptability of the proposed <br />s u bstitutio n. <br />4. No substitutions will be considered by the Engineer after 30 days <br />from the Contract Date. <br /> <br />C. Contractor's Representation: <br /> <br />1. A request for a substitution constitutes a representation that <br />Contractor: <br /> <br />01600-5 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.