My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Each sample shall have a label indicating <br />1. Name of Project <br />2. Name of Contractor and Subcontractor <br />3. Material or Equipment Represented <br />4. Place of Origin <br />5. Name of Producer and Brand (if any) <br />6. Location in Project <br />(Samples of finished materials shall have additional marking that will identify them under <br />the finished schedules.) <br />D. The Contractor shall prepare a transmittal letter in triplicate for each shipment of samples <br />containing the information required in subparagraph 1.07B above. He shall enclose a <br />copy of this letter with the shipment and send a copy of this letter to the Engineer. <br />Approval of a sample shall be only for the characteristics or use named in such approval <br />and shall not be construed to change or modify any Contract requirements. <br />E. Approved samples not destroyed in testing shall be sent to the Engineer or stored at the <br />site of the work. Approved samples of the hardware in good condition will be marked for <br />identification and may be used in the work. Materials and equipment incorporated in <br />work shall match the approved samples. Samples which failed testing or were not <br />approved samples will be returned to the Contractor at his expense, if so requested at time <br />of submission. <br />PART 2 - PRODUCTS (Not Used). <br />PART 3 - EXECUTION (Not Used). <br />END OF SECTION <br />12/04 01340 -6 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.