Laserfiche WebLink
C. Each sample shall have a label indicating <br />1. Name of Project <br />2. Name of Contractor and Subcontractor <br />3. Material or Equipment Represented <br />4. Place of Origin <br />5. Name of Producer and Brand (if any) <br />6. Location in Project <br />(Samples of finished materials shall have additional marking that will identify them under <br />the finished schedules.) <br />D. The Contractor shall prepare a transmittal letter in triplicate for each shipment of samples <br />containing the information required in subparagraph 1.07B above. He shall enclose a <br />copy of this letter with the shipment and send a copy of this letter to the Engineer. <br />Approval of a sample shall be only for the characteristics or use named in such approval <br />and shall not be construed to change or modify any Contract requirements. <br />E. Approved samples not destroyed in testing shall be sent to the Engineer or stored at the <br />site of the work. Approved samples of the hardware in good condition will be marked for <br />identification and may be used in the work. Materials and equipment incorporated in <br />work shall match the approved samples. Samples which failed testing or were not <br />approved samples will be returned to the Contractor at his expense, if so requested at time <br />of submission. <br />PART 2 - PRODUCTS (Not Used). <br />PART 3 - EXECUTION (Not Used). <br />END OF SECTION <br />12/04 01340 -6 04 -4801 <br />