My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />B. Pay all costs for installation, maintenance and removal, and service charges for local <br />calls. Toll charges shall be paid by the party who places the call. <br />PART 3 - EXECUTION <br />3.01 GENERAL <br />A. Comply with applicable requirements specified in Division 15 - Mechanical and in <br />Division 16 - Electrical. <br />B. Maintain and operate systems to assure continuous service. <br />C. Modify and extend systems as work progress requires. <br />3.02 REMOVAL <br />12/04 <br />A. Completely remove temporary materials and equipment when their use is no longer <br />required. <br />B. Clean and repair damage caused by temporary installations or use of temporary facilities. <br />C. Restore permanent facilities used for temporary services to specified condition. <br />END OF SECTION <br />01510 -3 <br />04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.