My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />n <br />a <br />1 <br />product and to form an opinion as to its conformity to the specifications. The data shall <br />comply with Paragraph 1.07 of this Section. <br />C. Facilities and labor for handling and inspection of all materials and equipment shall be <br />furnished by the Contractor. If the Engineer requires, either prior to beginning or during <br />progress of the work, the Contractor shall submit samples of materials for such special <br />tests as may be necessary to demonstrate that they conform to the specifications. Such <br />samples shall be furnished, stored, packed, and shipped as directed at the Contractor's <br />expense. <br />D. The Contractor shall submit data and samples sufficiently early to permit consideration <br />and approval before materials are necessary for incorporation in the work. Any delay of <br />approval resulting from the Contractor's failure to submit samples or data promptly shall <br />not be used as a basis of claim against the Owner or the Engineer. <br />E. In order to demonstrate the proficiency of workmen or to facilitate the choice among <br />several textures, types, finishes, and surfaces, the Contractor shall provide such samples of <br />workmanship or finish as may be required. <br />F. The materials and equipment used on the work shall correspond to the approved samples <br />or other data. <br />1.04 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br />A. When Contract Documents require that installation of work shall comply with <br />manufacturer's printed instruction, obtain and distribute copies of such instructions to <br />parties involved in the installation, including copies to the Engineer. <br />1. Maintain one set of complete instructions at the job site during installation and <br />until completion. <br />B. Handle, install, connect, clean, condition and adjust products in strict accord with such <br />instructions and in conformity with specified requirements. <br />Should job conditions or specified requirements conflict with manufacturer's <br />instructions, consult with Engineer for further instructions. <br />2. Do not proceed with work without clear instructions. <br />C. Perform work in accord with manufacturer's instructions. Do not omit any preparatory <br />step or installation procedure unless specifically modified or exempted by Contract <br />Documents. <br />1.05 TRANSPORTATION AND HANDLING <br />A. Arrange deliveries of Products in accord with construction schedules, coordinate to avoid <br />conflict with work and conditions at the site. <br />1. Deliver Products in undamaged condition, in manufacturer's original containers or <br />packaging, with identifying labels intact and legible. <br />1 12/04 01600 -2 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.