My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. For products specified by naming one or more Products or manufacturers and "or <br />equal ", Contractor must submit a request as for substitutions for any Product or <br />manufacturer not specifically named. <br />C. Substitutions: <br />1. For a period of 30 days after the effective date of the Agreement, the Engineer <br />will consider written requests from Contractor for substitution of Products. <br />2. Submit a separate request for each Product, supported with complete data, with <br />drawings and samples as appropriate, including: <br />a. Comparison of the qualities of the proposed substitution with that <br />specified <br />b. Changes required in other elements of the work because of the <br />substitution <br />C. Effect on the construction schedule <br />d. Cost data comparing the proposed substitution with the Product specified <br />e. Any required license fees or royalties <br />f. Availability of maintenance service, and source of replacement materials <br />3. The Engineer shall be the judge of the acceptability of the proposed substitution. <br />4. No substitutions will be considered by the Engineer after 30 days from the <br />Contract Date. <br />D. Contractor's Representation: <br />1. A request for a substitution constitutes a representation that Contractor: <br />a. Has investigated the proposed Product and determined that it is equal to <br />or superior in all respects to that specified <br />b. Will provide the same warranties or bonds for the substitution as for the <br />Product specified <br />C. Will coordinate the installation of an accepted substitution into the Work, <br />and make such other changes as may be required to make the Work <br />complete in all respects <br />d. Waives all claims for additional costs, under his responsibility, which may <br />subsequently become apparent. <br />E. The Engineer will review requests for substitutions with reasonable promptness, and <br />notify Contractor, in writing, of the decision to accept or reject the requested substitution. <br />1.08 SPECIAL TOOLS <br />A. Manufacturers of equipment and machinery shall furnish any special tools (including <br />grease guns or other lubricating devices) required for normal adjustment, operations and <br />maintenance, together with instructions for their use. The Contractor shall preserve and <br />deliver to the Owner these tools and instructions in good order no later than upon <br />completion of the Contract. <br />1 12/04 01600 -5 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.