My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br />shall start the equipment, at least half load, once weekly for an adequate period of time to <br />insure that the equipment does not deteriorate from lack of use. <br />' <br />F. <br />All materials which, in the opinion of the Engineer, have become so damaged as to be <br />unfit for the use intended or specified shall be promptly removed from the site of the <br />work, and the Contractor shall receive no compensation for the damaged material or its <br />' <br />removal. <br />G. <br />Arrange storage in a manner to provide easy access for inspection. Make periodic <br />' <br />inspections of stored Products to assure that Products are maintained under specific <br />conditions, and free from damage or deterioration. <br />' <br />H. <br />Protection After Installation: <br />' <br />1. Provide substantial coverings as necessary to protect installed products from <br />damage from traffic and subsequent construction operations. Remove covering <br />when no longer needed. <br />' <br />I. <br />The Contractor shall be responsible for all materials, equipment, and supplies sold and <br />delivered to the Owner under this Contract until final inspection of the work and <br />acceptance thereof by the Owner. In the event any such material, equipment, and supplies <br />' <br />are lost, stolen, damaged, or destroyed prior to final inspection and acceptance, the <br />Contractor shall replace same without additional cost to the Owner. <br />J. <br />Should the Contractor fail to take proper action on storage and handling of equipment <br />t <br />supplied under this Contract within seven days after written notice to do so has been <br />given, the Owner retains the right to correct all deficiencies noted in previously <br />transmitted written notice and debit the cost associated with these corrections from the <br />' <br />Contractor's Contract. These costs may be comprised of expenditures for labor, equipment <br />usage, administrative, clerical, engineering and any other costs associated with making the <br />' <br />necessary corrections. <br />1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br />' <br />A. <br />Products List: <br />Within 30 days after the effective date of the Agreement, submit to the Engineer a <br />complete list of major products proposed to be used, with the name of the <br />manufacturer and the installing subcontractor. <br />B. Contractor's Options: <br />For Products specified only by reference standard, select any product meeting that <br />standard. <br />2. For Products specified by naming several products or manufacturers, select any <br />one of the products or manufacturers named, which complies with the <br />specifications. <br />01600 -4 <br />04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.