My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01700 <br />PROJECT CLOSEOUT <br />PART 1 - GENERAL <br />1.01 RELATED REQUIREMENTS <br />A. General provisions of Contract, including General and Supplementary Conditions. <br />B. Warranty and bond submittal. <br />C. Closeout submittals, warranties and bonds required for specific products of work. <br />1.02 SECTION INCLUDES <br />A. Administrative and procedural requirements for project closeout. <br />1. Inspection procedures. <br />2. Project record document submittal. <br />3. Final cleaning. <br />1.03 SUBSTANTIAL COMPLETION <br />A. Before requesting inspection for certification of Substantial Completion, complete the <br />following. List exceptions in the request. <br />1. If 100 percent completion cannot be shown, include a list of incomplete items, <br />the value of incomplete construction, and reasons the Work is not complete. <br />2. Advise Owner of pending insurance change -over requirements. <br />3. Submit specific warranties, workmanship bonds, maintenance agreements, final <br />certifications and similar documents. <br />4. Obtain and submit releases enabling the Owner unrestricted use of the Work and <br />access to services and utilities; include occupancy permits, operating certificates, <br />and similar releases. <br />5. Submit record drawings, maintenance manuals, and similar final record <br />information. <br />6. Complete start-up testing of systems, and instruction of the Owner's operating <br />and maintenance personnel. Discontinue or change over and remove temporary <br />facilities from the site, along with construction tools, mock -ups, and similar <br />elements. <br />12/04 01700 -1 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.