My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. When the Contractor considers the Work to be substantially complete, he shall submit a <br />written notice to the Engineer that the Work, or designated portion of the Work, is <br />' complete and ready for inspection. <br />C. Within a reasonable time of receipt of a request for inspection, the Engineer will either <br />proceed with inspection or advise the Contractor of unfulfilled requirements. When the <br />Engineer and Owner concur that the Work, or designated portion of the Work, is <br />substantially complete, the Engineer will prepare the Certificate of Substantial <br />' Completion following inspection. <br />D. Should the Engineer determine that the Work is not substantially complete, he will advise <br />the Contractor of construction that must be completed or corrected before the certificate <br />' will be issued. <br />1. The Engineer will repeat inspection when requested and assured that the Work <br />' has been substantially completed. <br />2. Results of the completed inspection will form the basis of requirements for final <br />acceptance. <br />1.04 FINAL COMPLETION <br />A. When Contractor considers the Work to be complete, he shall submit written certification <br />to the Engineer that the Work is completed and ready for final inspection. Include the <br />' following: <br />1. Submit the final payment request with releases and supporting documentation not <br />' previously submitted and accepted. Include certificates of insurance for products <br />and completed operations where required. <br />2. Submit an updated final statement, accounting for final additional changes to the <br />' Contract Sum. <br />3. Submit a certified copy of the Engineer's final inspection list of items to be <br />completed or corrected, stating that each item has been completed or otherwise <br />resolved for acceptance, the list has been endorsed and dated by the Engineer. <br />' 4. Submit final meter readings for utilities, a measured record of stored fuel, and <br />similar data as of the date of Substantial Completion, or when the Owner took <br />possession of and responsibility for corresponding elements of the Work. <br />' 5. Submit consent of surety to final payment. <br />I 6. Submit evidence of final, continuing insurance coverage complying with <br />insurance requirements. <br />1 <br />F1 <br />1 12/04 01700 -2 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.