My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />C. Observe rules and regulations governing respective utilities in working under <br />requirements of this section. Adequately protect utilities from damage, remove or <br />relocate as indicated, specified or required. Remove, plug or cap inactive or abandoned <br />utilities encountered in excavation. Record location of active utilities. <br />1.06 QUALITY ASSURANCE <br />A. Requirements of all applicable building codes and other public agencies having <br />jurisdiction upon the work. <br />B. Primary emphasis should be given to the aesthetic appearance and functioning of <br />berming and swales, as directed by the Landscape Architect or Owner's Representative. <br />The Contractor shall employ skilled personnel and any necessary equipment to ensure <br />that finish grading is smooth, aesthetically pleasing, drains well, and is ideal for <br />receiving sod and plant materials. <br />PART 2 MATERIALS <br />2.01 TOP SOIL <br />A. In areas to receive turf, rough grade shall be 6 inches below finished grades, verify that <br />soil contains enough organic matter to support and encourage rooting of sod. Fill is to be <br />fine, compacted satisfactory fill material with no rocks larger than 2- inches. <br />B. Both surface and subsurface before and after fill operations shall be checked to confirm <br />that percolation/compaction levels meet the needs of the proposed planting for that area. <br />C. 12 inches of 80 -20 Topsoil mix shall be used on all turf and planting areas, it shall be <br />free from debris, sod, biodegradable materials, and other deleterious materials. The <br />Contractor shall ensure that all subsurface soil has sufficient percolation and surface <br />drainage to support grasses and plant material and that compaction shall be no greater <br />than 85% and no less than 75 %. <br />PART 3 EXECUTION <br />3.01 EXCAVATION <br />A. Excavate where necessary to obtain subgrades, percolation and surface drainage as <br />required. <br />B. Materials to be excavated are unclassified. <br />C. Remove entirely any existing obstructions after approval by the Landscape Architect's or <br />Owner's Representative. <br />D. Remove from site and dispose of debris and excavated material not required. <br />1 12/04 02210 -2 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.