My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02481 <br />PART 1 - GENERAL <br />1.01 SCOPE OF WORK <br />A. Provide all labor, materials, necessary equipment and services to complete the Fine <br />Grading work, as indicated on the drawings, as specified herein or both, except as for <br />items specifically indicated as "NIC ITEMS ". <br />1.02 RELATED WORK <br />A. Section 02210 - Fine Grading <br />B. Section 02484 - Soil Preparation and Soil Mixes <br />C. Section 02487 - Sodding <br />D. Section 02490 - Trees, Plants, and Groundcover <br />11*17c�031iY41 0 1911[S]II <br />12/04 <br />A. Plant materials to be relocated on site are designated on the drawings or as directed by <br />the Landscape Architect. <br />B. The Contractor's crew utilized for the relocation of existing trees and shrubs shall have <br />minimum five years experience in relocation of existing plant materials and be <br />recognized by the American Association of Nurserymen. <br />C. Existing trees to remain shall be protected during all construction phases as noted on <br />demolition plan. Any trees or shrubs scarred or destroyed designated to remain will be <br />replaced at the Contractor's expense, with similar species, size and quality. <br />D. Remove other trees, saplings, shrubs, bushes, vines and undergrowth as necessary and as <br />directed by the Landscape Architect to accommodate new plantings. Prepare areas to be <br />planted per Specification Sections 02484, 02487, and 02490. <br />E. Resulting tree pits and shrub bed pits of relocated material shall be backfilled with clean <br />fill and brought back flush with surrounding grade if required. It shall be the <br />contractor's responsibility to correct problems caused by erosion, wind, etc., in the <br />reclaimed area where he has dug. <br />F. In areas where new plant material will replace relocated plant material, appropriate <br />planting soil mix shall be used as backfill. <br />02481 -1 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.