My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 SUBMITTALS <br />A. Contractor to submit a list of equipment, procedure, and labor force anticipated for use <br />of shrub and tree relocation. <br />B. Contractor to submit a schedule by day as to how many units can be dug and relocated to <br />specified areas. Note for those materials that may require root pruning, the relocation <br />schedule to begin at the end of the specified root pruning period. <br />C. Contractor shall apply and secure any and all permits if required by any city, state, or <br />federal agency or governing body. <br />1.05 GUARANTEE <br />A. Guarantee all plant material for a period of twelve months after date of Substantial <br />Completion. <br />B. Replacement plants under this guarantee shall be replaced within two weeks of rejection <br />and guaranteed for twelve months from date of installation. <br />C. Repair damage to other plants, lawn or construction work during plant replacement at no <br />cost to the Owner (this includes, but is not limited to, damage to curbs, walks, roads, <br />fences, site furnishings, etc.). <br />1.06 TAGGING <br />A. Trees and shrubs within the designated areas for relocation shall be clearly marked by <br />means of yellow plastic surveyor's ribbons and coordinated with Landscape Architect <br />and shall be inspected and approved by the Owner's representative prior to root pruning <br />and /or digging. <br />1.07 ROOT PRUNING <br />A. Trees to be relocated shall be root pruned at least 45 days prior to digging with clean, <br />sharp equipment. No mechanical means (ie. Backhoes) may be utilized for the root <br />pruning only shovels or jackhammer type shovels shall be permitted. A pneumatic <br />excavating tool may be utilized to expose the roots at locations within 5' from existing <br />trees to better route lines or pipes to preserve the root mass of those trees noted to <br />remain. The specific requirements for root ball sizes shall be in accordance with the <br />table below or to the drip line of the tree. The root - pruned trees shall be watered 3 times <br />a week by Landscape Contractor as part of this contract. <br />B. Palms and shrubs to be relocated shall be root pruned at least 30 days prior to digging, <br />with clean, sharp equipment. Palms relocated by tree spade may forego the root - pruning <br />requirement, but shall adhere to root ball size charts below. <br />C. Root Ball Size Chart - Note: Root ball sizes shall be in accordance with minimum <br />standards set forth in Grades and Standards for Nursery Plants Part Il, Palms and Trees, <br />Florida Department of Agriculture. <br />1. LARGE SHRUBS - Minimum Ball Sizes: <br />a. Caliper Minimum Ball Diameter <br />1 12/04 02481 -2 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.