My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 <br />SECTION 02484 <br />SOIL PREPARATION AND SOIL MIXES <br />PART 1 - GENERAL <br />1.01 SCOPE OF WORK <br />A. Provide all labor, materials, necessary equipment and services to complete the soil <br />preparation and soil mixes work, as indicated on the drawings, as specified herein or <br />both, except as for items specifically indicated as "NIC ITEMS ". <br />B. Including, but not limited to: <br />1. Topsoil <br />' 2. Soil Conditioners <br />3. Planting Soil Mixes <br />' 1.02 RELATED WORK <br />1.03 <br />1I <br />A. Section 02210 - Fine Grading <br />B. Section 02481 - Shrub and Tree Relocation <br />C. Section 02487 - Sodding <br />D. Section 02490 - Trees, Plants, and Groundcover <br />QUALITY ASSURANCE <br />A. Testing Agency: Independent testing laboratory <br />B. Requirements or Regulatory Agencies: Conform to requirements of all City, County and <br />State agencies. <br />C. Reference standards. <br />SUBMITTALS: <br />A. Test Reports: Test reports shall consist of pH range, major and minor element analysis, <br />soluble salt concentrations, and recommendations. Reports shall be identified by project <br />name, date, and soil mix type. <br />1. Results of topsoil (on -site existing soil) analysis. <br />2. Results of planting soil mix(es) analysis: One test required per each type of soil <br />mix (note: pH ranges for plant type). <br />B. Certificates: <br />1. The Contractor must submit certificates from suppliers stating that the topsoil <br />mix, sod and other landscape material used comply with requirements specified. <br />12/04 02484 -1 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.