Laserfiche WebLink
4. Smooth topsoil to two inches (2 ") below finish grade in areas to be sodded. <br />Remove plant material not indicated as existing or be relocated in order to <br />adhere to sod lines. <br />5. Prior to installing planting soil, test tree pits and planting areas for percolation. <br />If areas do not drain, it is the contractor's responsibility to assure percolation by <br />approved means. <br />6. Remove limerock or soil cement in tree planter islands within paved parking <br />areas. Do not damage sub -base material for paved surfaces. Assure percolation <br />and then backfill with approved planting soil mix. <br />3.04 CLEAN -UP <br />A. Immediately clean up spills, soil and conditioners on paved and finished surface areas. <br />B. Remove debris and excess materials from project site immediately. <br />END OF SECTION <br />12/04 02484 -6 04 -4801 <br />