My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-02) Golden Shores Entrance Wall
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:36:48 AM
Creation date
1/13/2011 11:30:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Entrance Wall
Bid No. (xx-xx-xx)
04-12-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISECTION 01030 <br />' SPECIAL PROJECT PROCEDURES <br />PART 1- GENERAL <br />' 1.01 OBSTRUCTIONS <br />' A. The attention of the Contractor is drawn to the fact that during construction at the Project <br />site, the possibility exists of the Contractor encountering various water, sewer, petroleum, <br />gas, telephone, electrical, or other lines not shown on the Drawings. The Contractor shall <br />' exercise extreme care before and during construction to locate and flag these lines so as to <br />avoid damage to the existing lines. Should damage occur to an existing line, the Contractor <br />shall repair the line at no cost to the Owner. <br />' 1.02 PROVISIONS FOR THE CONTROL OF DUST <br />' A. Sufficient precautions shall be taken during construction to minimize the amount of dust <br />created. Wetting down the site may be required or as directed by the Engineer to prevent <br />dust as a result of vehicular traffic. <br />' 1.03 RELOCATIONS <br />' A. The Contractor shall be responsible for the relocation of structures, including but not <br />limited to light poles, signs, sign poles, fences, piping, conduits and drains that interfere <br />with the positioning of the work as set out on the Drawings. The cost of all such <br />relocations shall be included in the bid for the project and shall not result in any additional <br />' cost to the Owner. <br />1.04 WARRANTIES <br />' A. All equipment supplied under these Specifications shall be warranted by the Contractor and <br />the equipment manufacturers for a period of one (1) year. Warranty period shall commence <br />on the date of Owner acceptance. <br />B. The equipment shall be warranted to be free from defects in workmanship, design and <br />' materials. If any part of the equipment should fail during the warranty period, it shall be <br />replaced in the machine(s) and the unit(s) restored to service at no expense to the Owner. <br />C. The manufacturer's warranty period shall run concurrently with the Contractor's warranty <br />or guarantee period. No exception to this provision shall be allowed. <br />D. In the event that the manufacturer is unwilling to provide a one year warranty commencing <br />at the time of Owner acceptance, the Contractor shall obtain from the manufacturer a two <br />(2) year warranty starting at the time of Owner acceptance of the equipment. <br />1 12/04 01030 -1 04 -4801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.