My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums 4 & 5
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-04-01) 181st Drive Active Park
>
Addendums 4 & 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2012 12:41:34 PM
Creation date
1/14/2011 11:59:07 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
181st Drive Active Park
Bid No. (xx-xx-xx)
05-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
181sT ACTIVE PARK <br />Addendum No. 5 <br />to <br />Contract documents <br />CITY OF SUNNY ISLES BEACH <br />181 ST DRIVE ACTIVE PARK <br />18115 NORTH BAY ROAD <br />ML PROJECT NO.: 114122 <br />CITY BID NO.: 05 -04 -01 <br />To All Bidders: <br />ADD. June 6, 2005 <br />Bidders for the above - referenced project shall take note of the following changes, <br />additions, deletions, clarifications, etc. to the Plans and Specifications, which in <br />accordance with the Contract Documents shall become a part of and have precedence <br />over anything shown or described otherwise. <br />Please make the following changes to the contract documents, specifications, and <br />plans. <br />In the contract documents: <br />Replace: 00900 -5 and 00900 -6 ADD. May 24, 2005 <br />Insert: 00900 -5 thru 00900 -8 ADD. June 6, 2005 <br />The following quantities for the Landscape Spot Lighting (Site Lighting) shall be revised <br />to reflect the following from 4 to 9. <br />Replace: 00310 -1 and 00310 -2 April 10, 2005 <br />Insert: 00310 -1 and 00310 -2 ADD. June 6, 2005 <br />The following additional information is provided to the Contractors <br />• Plan sheet E -100 (Electrical Site Plan) does not indicate a total of 32 "S" fixtures. <br />South of the Gymnasium Building 8 fixtures have been omitted from the plan <br />sheet and shall be included as per indicated on plan sheet SP -1 (4/28). <br />Contractor shall provide for installation, wiring, etc. The original bid schedule <br />reflects the correct quantity of fixtures of 32. <br />• The drainage well structure shall provide for 2,500 gallons per minute. <br />• The depth of the drainage well shall be based on yielding of 2,500 gallons per <br />minute. <br />ADDENDA 00900 -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.