FUSE EXTENDED CONGESTION, THE <br />1. THE CONTRACTOR SHALL CONFIRM THAT EXISTING SI <br />UNTIL SUCH TIME AS TRAFFIC FLOW <br />MAINTENANCE OF TRAFFIC. THE CONTRACTOR SHALL <br />CONFLICT WITH TRAFFIC CONTROL DURING CONSTRU( <br />STING SIGNS WITHIN THE PROJECT LIMITS. <br />NGINEER PRIOR TO THE BEGINNING OF CONSTRUCTION. <br />2. INSTALL CONSTRUCTION SIGNING PRIOR TO COMMEN <br />SIGNING DURING CONSTRUCTION IN ACCORDANCE WIl THE CONTRACTOR AT NO ADDITIONAL EXPENSE. <br />SSARY SO AS TO AVOID CONFLICT <br />REFERENCED IN EACH PHASE. <br />3. THE SPEED AS POSTED WILL REMAIN FOR EACH L0' <br />? -4770) FOR VERIFICATION OF UTILITY LOCATIONS. <br />4. THE CONTRACTOR SHALL OPEN ALL LANES OF TRAF <br />DURING PEAK HOURS AND INACTIVE WORK ZONES. FICE OF A HURRICANCE OR <br />AND 5:00 AM TO 7:00 PM. THE ENGINEER MAY ACURATION OF THE EVACUATION OR EVENT AS <br />--DOT INDICES 600, AND 623. <br />PAY ITEMKS <br />102 -1 <br />1 102 -74- <br />rtor�w aec�sra� non n,. z�e�s N.T.S. <br />C7 <br />03 -4138 <br />w raa <br />°OE MOT -NOTES I a 7 <br />