My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No.1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-06-01) Median Fencing Improv.
>
Addendum No.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2012 12:46:07 PM
Creation date
1/18/2011 4:55:13 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Median Fencing Improv.
Bid No. (xx-xx-xx)
05-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />THIS AGREEMENT is dated as of the day of <br />in the <br />CITY OF SUNNY ISLES BEACH (hereinafter called OWNER) an( <br />Florida Corporation hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />Article 1. WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents as are <br />defined in the "Standard General Conditions of the Construction Contract" 1996 Edition "General <br />Conditions ". The Work is generally described as follows: <br />Construction of a fencing system consisting of furnishing and installing 1,175 +/- linear feet of <br />three -foot (3') high black metal picket fence and repairing /resetting 16 +/- linear feet of existing <br />three -foot (3') high black metal picket fence. <br />Article 2. ENGINEER. <br />The Project has been designed by: CALVIN, GIORDANO & ASSOCIATES, INC. <br />1800 Eller Drive, Suite 600 <br />Fort Lauderdale, Florida 33316 <br />who is hereinafter called ENGINEER and who is to act as OWNER'S representative, assume all duties <br />and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents <br />in connection with completion of the Work in accordance with the Contract Documents. <br />Article 3. CONTRACT TIMES. <br />3.1. The work will be substantially completed within 60 days after the date when the Contract <br />Times commence to run as provided in paragraph 2.03 of the General Conditions, and completed <br />and ready for final payment in accordance with paragraph 14.07 of the General Conditions within <br />90 days after the date when the Contract Times commence to run. <br />3.2. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the <br />essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed <br />within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in <br />accordance with Article 12 of the General Conditions. They also recognize the delays, expense and <br />difficulties involved in proving the actual loss suffered by OWNER if the Work is not completed on <br />time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that <br />as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Five <br />Hundred and 00 /100 dollars ($500.00) for each day that expires after the time specified in <br />paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial <br />Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within <br />the time specified in paragraph 3.1 for completion and readiness for final payment or any proper <br />06/05 00500 -1 03- 4138.B <br />
The URL can be used to link to this page
Your browser does not support the video tag.