My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(05-10-01) Central Island Drainage & St. Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:15:06 AM
Creation date
1/19/2011 10:58:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage & St. Improv.
Bid No. (xx-xx-xx)
05-10-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBid of (Name of Bidder <br />IAddress <br />SECTION 00300 <br />1 Phone Fax: <br />' To furnish all materials, equipment and labor and to perform all work in accordance with the Contract <br />Documents for construction of: CENTRAL ISLAND DRAINAGE AND STREETS IMPROVEMENTS <br />located in the CITY OF SUNNY ISLES BEACH. <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />' Sunny Isles Beach, Florida 33160 <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work <br />and is familiar with the nature and extent of the work and any local conditions that may in any manner <br />affect the work to be done. <br />' The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding <br />Documents, in the manner prescribed therein and to the standards of quality and performance established <br />by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or <br />i combination of items stipulated. Unit price line items shall include cost of implementing all applicable <br />safety requirements. Bidder acknowledges that estimated quantities scheduled are approximated for the <br />sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual <br />' quantities required may increase or decrease. Bidder further agrees that payments will be made on the <br />basis of actual quantities placed and accepted in the construction <br />UNIT BID PRICE SCHEDULE <br />Item No. <br />Description <br />Estimated <br />Quantity <br />Unit <br />Unit Price <br />Estimated <br />Amount <br />101 -1 <br />Mobilization <br />1.0 <br />LS <br />102 -1 <br />Maintenance of Traffic <br />365 <br />LS/Da <br />102 -3 <br />Commercial Material for Driveway Repair <br />500 <br />CY <br />102 -14 <br />Traffic Control Officer <br />100 <br />MH <br />102 -61 <br />Project Sign, See Special Provisions <br />3 <br />Ea <br />1 09/24 00300 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.