Laserfiche WebLink
18.7 If the Contractor feels that a problem exists either prior to, or during the bid opening, he /she <br />1 shall contact the City (within 24 hours of the bid opening) and follow the City's current policy <br />for bid protests. <br />18.8 The Owner reserves the right to award as a total contract any combination of the Unit Price Bid <br />' Schedule Items that would be in the best interest of the Owner. <br />19. CASH ALLOWANCES <br />' 19.1 The Bidder is advised that a space is provided in the Bid Form, Document 00300, for this <br />purpose only. The Contractor shall not proceed on any additional work to be covered by <br />I allowances until authorized in writing by the Engineer. Such work shall be approved by the <br />Owner, shall be within the scope of work defined by this Contract and shall not exceed the <br />amount indicated in the Bid Form. Any amount remaining in the Cash Allowance will be <br />retained by the Owner. <br />END OF DOCUMENT <br />1 06/05 <br />00100 -7 <br />