Laserfiche WebLink
r <br />16. SUBCONTRACTOR LIST <br />' 16.1 In conjunction with the Bid Form, Bidder shall submit a list of names of the subcontractors and <br />major material suppliers proposed for the principal portions of the Work. Submit list on form <br />rprovided by the Engineer. <br />16.2 Prior to award of Contract, the Owner will notify the Bidder in writing if they have an objection <br />to any person or entity listed. Upon such reasonable objection, the Bidder shall propose an <br />acceptable substitute person or entity in accordance with Article 6.06 of the General <br />Conditions. <br />17. BID PROTEST <br />17.1 In the event of a timely protest, the City Manager or his designee shall stay the award of the <br />contract unless, after consulting with the City Attorney and the affected director, he determines <br />that the award of the contract without delay is necessary to protect substantial interests of the <br />Owner. <br />17.2 The City shall require a deposit from a protester to compensate the Owner for the expenses of <br />administering the protest. If the protest is decided in the protester's favor, the entire deposit <br />' shall be returned to the protester. If the protest is not decided in the protester's favor, the deposit <br />shall be forfeited to the Owner. The deposit shall be in the form of a cashier's check and shall <br />be in the amount of 1% of the amount of the pending award, with a minimum deposit of $500 <br />rand a maximum deposit of $10,000. <br />18. CONTRACT AWARD AND EXECUTION <br />18.1 Until final award of Contract, the Owner reserves the right to reject any and all Bids, with or <br />without cause; to waive any informality or irregularity; or to accept the Bid which is in the best <br />interest of the Owner. <br />r18.2 It is the intent of the Owner to award a Contract to the lowest responsible Total Base Bidder <br />whose Bid is in conformance with the Bidding Documents and does not exceed the funds <br />available. <br />18.3 Upon acceptance of a Bid and award of the Contract, the successful Bidder shall deliver the <br />executed Contract, along with required bonds and any other items requested, to the Owner <br />within 10 working days. Failure to do so will be deemed as a breach of agreement by the <br />Bidder and result in forfeiture of bid security as described in the Instructions to Bidders. <br />r 18.4 The Owner reserves the right to hold all proposals and bid guarantees for a period not to exceed <br />90 days after the date of bid opening stated in the Advertisement for Bids. <br />' 18.5 The award of the contract, if it is awarded, will be to the lowest responsible total base bidder <br />whose qualifications indicate the award will be to the best interest of the Owner and whose <br />proposal shall comply with the requirements of the Contract Documents. Time is of the essence <br />for this project and the time limits set in the proposal, if set by the bidder, will be accorded <br />weight by the Owner in the determination of the best proposal. In no case will the award be <br />made until all necessary investigations have been made into the responsibility of the low bidder <br />and the Owner is satisfied that the bidder is qualified to do the Work and have the necessary <br />organization, capital and equipment to carry out the provisions of the contract to the satisfaction <br />of the Owner within the time specified. <br />r06/05 00100 -6 <br />