My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-01-02) Beach Access Signs
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:38:19 AM
Creation date
1/19/2011 2:24:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Beach Access Signs
Bid No. (xx-xx-xx)
06-01-02
Project Type (Bid, RFP, RFQ)
Bid
Document Relationships
Bid opening report
(Message)
Path:
\City Clerk\Bids-RFQ-RFP\ITB\(06-01-02) Beach Access Signs
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Company, applied in proper manner with 3M or equivalent application tape as <br />specified. Use approved fonts and equipment as specified. <br />2.06 Application of Sign Elements <br />A. Preparation Surfaces to receive the sign elements shall be clean, dry, and <br />otherwise made ready for the application of materials. Accurately measure <br />and layout the required marking configurations as indicated on drawings. <br />B. Sign Graphics Provide letters, numerals, symbols, and other graphics <br />markings, using finish materials shown. Apply the graphics neatly, uniformly <br />proportioned and spaced, and accurate within the dimensions indicated. <br />Prepare the substrate surfaces and apply finish materials in accordance with <br />Fabricator's instructions. <br />PART 3 - EXECUTION <br />3.01 Delivery of Signs <br />' General All product will be shipped /delivered to City of Sunny Isles Beach as <br />directed by James Watts, Director of Public Works, (786) 202 -1126. <br />3.02 Guarantee <br />Fabricator to provide full guarantee of all workmanship, materials, equipment, etc. of <br />this installation for a period of two (2) years. Fabricator shall replace /repair any <br />defective work within a reasonable and agreed upon time period after notification by <br />Designer /Client, throughout the duration of this period. <br />3.03 Fabrication Errors <br />' If the Fabricator has made an error in copy, color, material, quality, etc. these <br />items must be corrected as soon as possible after Designer /Client's observation <br />of error (at no additional cost to the Client). Designer /Client will notify the Fabricator with <br />' a written punch list as errors, blemishes and the need to modify delivered products are <br />discovered. <br />LEI <br />1 <br />02/06 8 03- 4122.E <br />
The URL can be used to link to this page
Your browser does not support the video tag.