Laserfiche WebLink
planning, civil engineering, electrical <br />engineering for street lighting, <br />mechanical engineering for new chilled <br />water main plant interconnection, <br />landscape architecture and irrigation <br />design plans, permitting with South <br />Florida Water Management District and <br />Lake Worth Drainage District, and <br />construction phase services. This project <br />also required coordination with other <br />government agencies, including the <br />Florida Fish & Wildlife Conservation <br />Commission. <br />Avon Park Streetscape <br />Improvements - Planned urban design <br />changes to the City Center area of the <br />City of Avon Park in conjunction with <br />modifications to SR 64, the City's Main <br />Street and Commercial Center . The <br />initial streetscape plans included public <br />involvement, re -doing the street and <br />sidewalks in the Central Business <br />District, landscaping and irrigation, and <br />other improvements. Miller Legg worked <br />with FDOT District I on this project. <br />Plans were prepared according to FDOT <br />J. Aaron Smith, CID, CLIA <br />standards and reviewed by the agency on <br />several occasions. After several <br />iterations of taking bids, the City <br />determined that none of the bidders was <br />responsive, and has since modified the <br />scope of work to include a more limited <br />renovation to the sidewalks, lighting, and <br />landscaping. <br />