My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Note: 6 inches for all annual beds) below <br />finished soil elevation, backfilling with a <br />minimum 3 inches of planting soil mix, and <br />then tilling with all required amendments to a <br />depth of not less than 12 inches. <br />(Note: 6 inches for all annual beds. All areas <br />to be amended in such a manner shall be <br />highlighted on contractor's record drawings. <br />(3) Bring all beds and pits to smooth, even <br />surface conforming to established grades after full <br />settlement has occurred. <br />NOTE: Amending of and quantities of planting soil mixes <br />as outlined above contingent with existing soil <br />conditions. <br />B. Planting Beds: <br />1. Planting beds to a depth of 12 inch topsoil mixture. <br />2. Bring beds to smooth, even surface conforming to established <br />grades after full settlement has occurred. <br />3. Use specified planting soil to form watering berms around the <br />plants. <br />C. Test fill all tree pits with water before planting to assure proper drainage <br />percolation is available. Pits which are not adequately draining shall be <br />excavated to a depth sufficient for drainage and backfilling with gravel or <br />crushed rock. No allowances will be made for lost plants due to improper <br />drainage. Landscape Contractor shall replace with same species size and <br />specification at no cost to Owner. <br />3.04 PLANTING <br />A. General <br />1. Center plant in pit or trench. <br />2. Face for best effect, or as directed by Landscape Architect. <br />3. Set plant plumb and hold rigidly in position until soil has been <br />tamped firmly around planting ball. <br />4. Use only planting soil backfill as specified hereinbefore. <br />5. Place sufficient planting soil under plant to bring top of planting ball <br />to finish grade. <br />6. Backfill pit or trench with planting soil in 9 in. layers and water each <br />layer thoroughly to settle soil and work soil completely around roots <br />and planting ball. <br />07/06 02490 -9 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.