My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(06-06-03) Town Center Park Entry Sign
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 4:32:06 AM
Creation date
1/20/2011 5:12:56 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Entry Sign
Bid No. (xx-xx-xx)
06-06-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />r� <br />n <br />f, <br />I� <br />�J <br />i7 <br />1 <br />t <br />u <br />C± <br />r, <br />I� <br />`J <br />SECTION 02810 <br />IRRIGATION <br />PART 1 — GENERAL <br />1.01 RELATED DOCUMENTS <br />A. All applicable provisions of the Bidding and Contracting Requirements, <br />including General and Supplementary Conditions, and Division 1 - <br />General Requirements, shall apply to the work under this section. <br />1.02 WORK INCLUDED <br />A. The Irrigation Contractor (IC) shall provide all labor, materials, necessary <br />equipment, and services to complete the irrigation system, as indicated on <br />the drawings, as specified herein or both, except as for items specifically <br />indicated as "NIC ITEMS ". <br />B. The completed and proper construction of the landscape irrigation system <br />shall include, but not necessarily be limited to, the following: <br />1. All piping including mains, laterals, fittings, sleeves, connections, <br />tees, risers, clamps, and swing joints. <br />2. All control, gate, globe, pressure- reducing, quick - coupling, and <br />other valves including valve boxes, markers, connections, <br />operators, and other accessories. <br />3. The IC shall complete the automatic - control system as shown on <br />plans including controllers, control wiring, and low- voltage <br />connections. <br />4. All filters for drip or micro -spray sprinklers are as shown on the <br />plans. <br />5. All rotating and stationary spray sprinkler heads including proper <br />nozzles, as called for herein, and shown on the plans and all other <br />appurtenances and accessories for proper operation. <br />6. All bubblers and emitters as shown on the plans and in the detail <br />drawings. <br />7. Connections of mainline piping to the supply sources as shown on <br />the plans. <br />01106 02810 -1 05 -5564 <br />
The URL can be used to link to this page
Your browser does not support the video tag.