Laserfiche WebLink
I <br />E. The pipe and fittings shall be carefully inspected before installation of the <br />trench. All rocks over two -inch (1/2 ") diameter and unsuitable bearing <br />material shall be removed from trench in strict accordance with the <br />manufacturer's recommendations. <br />Solvent - welded joints shall be made only on clean, dry, square cut, <br />smooth pipe sections. The fittings shall be "dry" tested for proper <br />size before solvent is applied. The assembly shall proceed in strict <br />' accordance with recommended procedures furnished by the <br />manufacturer. <br />2. Solvent - welded pipe sections shall be "snaked" from side to side in <br />the trench to prevent joint rupture due to thermal contraction. <br />I 3. Pipe openings shall be plugged during construction to prevent <br />entrance of foreign materials. <br />F. Backfill shall be carefully placed to avoid pipe dislocation. Backfill material <br />shall be free of rocks, stumps, roots, and other unsuitable material. In <br />planting areas, the top six inches (6 ") shall be suitable planting soil. <br />Backfill shall be placed in six -inch (6 ") lifts and shall be thoroughly <br />compacted, except in planting area where planting soil is used. Backfill <br />under pavement or sidewalks shall be compacted to ninety -eight percent <br />(98 %) of maximum A.A.S.H.O. T -180 density. The surface of backfilled <br />trenches shall be even with the surrounding ground surface. <br />Plant locations shall take precedence over sprinkler and pipe locations. <br />The IC shall coordinate the routing of lines and final head locations with <br />the placement of specimen trees and shrubs. <br />3.03 SPRINKLER HEAD INSTALLATION <br />A. The IC shall be responsible for the exact location of all sprinkler heads, <br />acknowledging that the plans are schematic in nature. The IC shall <br />accordingly place all sprinkler heads, adjust all nozzles, spray patterns, <br />and make whatever other adjustments that may be required to give the <br />landscaped areas full, complete, and proper coverage and distributions, <br />and to meet all manufacturer's requirements. The IC shall make all such <br />adjustments and additions solely at his expense. <br />B. Sprinkler heads located along curbs and edges of paving shall be installed <br />six inches (6 ") from back -of -curb or paving; except along roadways without <br />curbs, sprinkler heads shall be located eighteen inches (12 ") from edge of <br />1 pavement. <br />I <br />07/06 02810 -17 05 -5564 <br />