Laserfiche WebLink
SECTION 03350 <br />CONCRETE FINISHES <br />PART 1 - GENERAL <br />1.01 WORK INCLUDED <br />A. Furnish labor, materials, equipment and incidentals required to finish cast - <br />in -place concrete surface as specified herein. <br />1.02 RELATED WORK <br />A. Cast -in -Place Concrete Section 03300. <br />B. Cementitious Coatings Section 09820 <br />1.03 REFERENCES <br />A. ACI 301 - Specifications for Structural Concrete for Buildings. <br />1.04 SUBMITTALS <br />A. Submit, as provided in the General Conditions and Section 01340 shop <br />drawings of the proposed chemical hardener, manufacturer's surface <br />preparation and application procedures. <br />1.05 SCHEDULE OF FINISHES <br />A. Concrete for the project shall be finished in the various specified manners <br />either to remain as natural concrete or to receive an additional applied finish <br />or material under another Section. <br />B. The base concrete for the following conditions shall be finished as noted <br />and as further specified herein: <br />1. Concrete to receive cementitious finish or stucco finish - Off -form <br />finish. <br />2. Concrete to receive dampproofing - Off -form finish. <br />3. Concrete to receive carpet and sheet vinyl flooring and interior <br />exposed slab concrete - steel trowel finish (two trowelings to a <br />burnished finish). <br />4. Bottom slab of exposed tanks - steel trowel finish. <br />07/06 03350 -1 05 -5564 <br />