Laserfiche WebLink
u <br />• Calvin, Giordano & Associates, Inc. <br />i <br />i <br />• <br />• <br />• <br />• The Calvin, Giordano & Associates, Inc. (CGA) project approach is based on our understanding of the project <br />goals and community needs coupled with our extensive experience and technical expertise gathered over the <br />• past 60 years of providing similar engineering services to municipalities throughout South Florida. We also <br />• have a complete team of engineers, planners, surveyors, underground locators, landscape architects, GIS <br />• coordinator, and construction management personnel dedicated to this project. Having so much of the project <br />staff under one roof will assure the City of responsive performance with minimal coordination time delays, <br />• more effective communication, and a more efficient use of resources. This all results in a project that is <br />• completed on -time and within budget. <br />• The CGA team will work closely with the City staff to address the different tasks of this project including the <br />• following items: <br />• Item 1 - Gravity Sewer System <br />• <br />• CGA will provide an 8" PVC gravity sewer to service all existing homes and vacant lots within the project <br />limit. This will consist of approximately 2,500 -1f of pipe and 20 manholes. The proposed system will be <br />i located along the centerline of the existing paved roadway discharging to a terminating manhole located <br />• southeast of the existing water body. A lateral service connection will be provided for each residential unit to <br />the right -of -way line and each homeowner will be responsible for removing the septic tank and connecting to <br />• the new service line. <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />w <br />i <br />Item 2 - Lift Station and Force Main <br />Option 1: Lift Station and Connection to Existing WASD Gravity Sewer <br />From the terminating manhole, wastewater will be conveyed to a standard WASD lift station package via <br />850 -1f of force main into an existing manhole located at the intersection of Atlantic Boulevard and Collins <br />Avenue. It is anticipated that a stand -by generator will not be required for this station due to low flow from <br />this project, less than 100 gallons per minute. <br />Option 2: Lift Station and Connection to Existing Force Main at Sunny Isles Beach Boulevard <br />Should the Miami -Dade Water and Sewer Department (M- DWASD) decide that Option 1 is not feasible due <br />to operation, maintenance or other engineering issues, the proposed force main would need to be extended <br />north to connect to an existing force main along Sunny Isles Beach Boulevard. This would require 1,000 -1f of <br />trenching along Collins Avenue as well as pavement restoration and maintenance of traffic during this <br />construction activity. <br />City gf'Sunny Isles Beach, Florida <br />Professional General Engineering Consultant <br />RFQ No. 06 -12 -02 <br />January 8, 2007 <br />