My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
Calvin Giordano & Assoc.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:15:21 AM
Creation date
1/24/2011 3:18:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />�J <br />• <br />Calvin, Giordano <br />• <br />Town of Jupiter, Florida <br />• <br />City of Pembroke Pines, Florida <br />• <br />13975 Pembroke Road <br />• <br />Pembroke Pines, FL 33027 <br />Contact: Joseph S. McLaughlin <br />• <br />(954) 435 -6500 <br />• <br />& Associates, Inc. <br />• <br />A-] -A Bike Lanes <br />• Calvin, Giordano & Associates, Inc. prepared the engineering design for improvements to for 2,400 feet of <br />C.R. A -1 -A from Indiantown Road to Jupiter Beach Road, conducted supplemental field surveys and <br />prepared a pedestrian access easement and restoration agreement. The drainage design featured <br />• reconstruction of the roadside swales, the addition of exfiltration trenches and addition of curb and gutter to <br />• the roadway to create a drainage system for a road that had no positive collection system. The project also <br />included the addition of bicycle lanes, new sidewalks and water main replacement. <br />9 <br />• <br />Town of Jupiter, Florida <br />• <br />210 Military Trail <br />• <br />Jupiter, FL 33458 <br />• <br />Contact: Thomas Driscoll <br />(561) 741 -2215 <br />• <br />• <br />• Downtown Master Plan Review <br />This project consisted of surveys to verify the elevations of the area included in the Downtown Master Plan <br />and for the evaluation of the drainage impacts and requirements of the Town's proposed Master Plan. Survey <br />• work included both field and office investigations of the Master Plan area. The drainage report evaluated the <br />loss of swale drainage and the options for replacing the swales by the creation of detention areas and <br />exfiltration trenches including presentations to the Town Council. <br />• <br />Town of Lantana, Florida <br />• <br />500 Greynolds Circle <br />• <br />Lantana, FL 33462 <br />• <br />Contact: David Thatcher <br />(561) 540 -5032 <br />• <br />• Park Avenue West of 7rh Street to US -I <br />• Park Avenue from west of 7`" Street to US — 1 was proposed to be reconstructed and CGA was asked to <br />• perform field surveys and locate future underground utilities. The engineering design includes the conversion <br />of an undivided 50 feet wide paved roadway to a two lane divided roadway with on- street parking. The <br />existing road has a very minimal drainage system and the proposed design will feature the creation of a <br />positive drainage system with inlets and exfiltration trenches. This project is in the design phase. <br />• <br />Town of Lake Park, Florida <br />• <br />535 Park Avenue <br />• <br />Lake Park, FL 3340 <br />Contact: Patrick Sullivan <br />(561) 881 -3318 <br />• <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.