•
<br />• Calvin, Giordano & Associates, Inc.
<br />Calvin, Giordano & Associates, Inc. is a well established consulting engineering firm that has been in
<br />business in South Florida for over 68 years. We provide a broad range of services including utility
<br />infrastructure design, roadway improvements, stormwater master plans, transportation engineering, and
<br />landscape architecture. Below is a list of related projects that we have completed and /or are currently
<br />working on that demonstrate the depth of our experience for providing superior engineering services to local
<br />municipalities:
<br />• City of Miami Beach North Shore Neighborhood Improvements, Miami Beach, Florida
<br />• City of Dania Beach, Lift Station No. 5 Rehabilitation, Dania Beach, Florida
<br />• City of North Lauderdale, Lift Station No. 10 Rehabilitation, North Lauderdale, Florida
<br />• City of Dania Beach, Stirling Road Water Main Relocation, Dania Beach, Florida
<br />• SR -AIA Drainage Repairs, Hallandale Beach, Florida
<br />• Town of Davie Utility Master Plan, Davie, Florida
<br />• City of North Lauderdale Lift Station No. 12, North Lauderdale, Florida
<br />• City of North Lauderdale,17th Street and 83`d Avenue Roadway Improvements, North Lauderdale,
<br />Florida
<br />SBDD basin S91SIO culvert reconstruction in vicinity of Griffin Rd and SBDD canals 12, 13, 13A
<br />CGA performed the design surveys and the engineering evaluation of the existing and proposed surface water
<br />management system including the system of canals, interconnecting culverts, outfall structures and a pump
<br />station. We also performed the surface water management system modeling and simulation for the existing
<br />and proposed conditions.
<br />South Broward Drainage District
<br />6591 SW 160`h Avenue
<br />Southwest Ranches, FL 33331
<br />Contact: Leo Schwartzberg, PE, CEP
<br />(954) 680 -3337
<br />Western Pines Road Improvements
<br />Calvin, Giordano & Associates, Inc. as part of a design -build team with Haskell, Inc. provided the survey and
<br />engineering for Pembroke Road, 196th Avenue, 184th Avenue, 172nd Avenue and Sheridan Street in the City
<br />of Pembroke Pines. The roadway configurations are as follows: design of a two -lane roadway as an extension
<br />of Pembroke Road from 184th Avenue to 196th Avenue — new two lane road; 196th Avenue from Pembroke
<br />Road to Pines Boulevard — new two -lane roadway ; 196th Avenue from north of Taft Street to Sheridan Street
<br />— widening; 184th Avenue between Pembroke Road and Sheridan Street - new 4 lane divided roadway; 172 °d
<br />Avenue between Pembroke Road and Sheridan Street - widening to a four -lane divided roadway; Pembroke
<br />Road from 184th Avenue to Dykes Road — reconstruction.
<br />Design services include paving, grading, drainage, sidewalks, roadway lighting, signing and pavement
<br />markings, up to 60% complete sufficient for securing permits
<br />
|