Laserfiche WebLink
a_ <br />Florida SVSTEM <br />r- <br />Project <br />�I <br />II <br />i� <br />'iordano Associates, Inc. <br />9tr <br />GwrA AM <br />CGA is providing general engineering services for the City of Weston, which include <br />master planning, computer modeling, financial assistance with a $23- million bond issue, <br />and design expansions and modifications to the existing wastewater transmission <br />facilities. <br />This project includes additional connections to the adjacent City's wastewater treatment <br />system, as well as modifications to over 30 existing lift stations, the addition of over 35 <br />new lift stations, and approximately 97,000 linear feet of six 30 -inch force mains. A SCADA <br />system was installed which will aid in the monitoring of new lift stations. <br />Client <br />City of Weston <br />Contact information <br />at time of project: <br />John Flint, City Manager <br />2500 Weston Road <br />Suite 101 <br />Weston, Florida 33331 <br />954 385 2000 <br />Project Date <br />1996 — present <br />Estimated Construction <br />Cost <br />$1,000,000 <br />Key Personnel <br />Karl Kennedy, PE <br />