My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(06-12-02) General Engineering Consultants
>
Responses
>
Calvin Giordano & Assoc.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 4:15:21 AM
Creation date
1/24/2011 3:18:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
06-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(-alvlri. Giordano &Associates, Inc. <br />Client <br />Hollywood, Dania Beach, <br />Pembroke Pines, and <br />Broward County, Florida <br />Project Date <br />2000 -2003 <br />Project Value <br />Various <br />Services Provided <br />Engineering Design <br />Key Personnel <br />Raw Water Projects, Hollywood Karl Kennedy, PE <br />CGA designed a new raw water main, 12 new wells, and generator building, and removed Eric Jones, PE <br />adjacent septic tanks and connections to the existing sanitary sewer system. An existing <br />wellfield was rehabilitated and 15 wells were abandoned. <br />South Broward Utility Water Treatment Plant, Broward County <br />CGA's engineering study analyzed the existing 1.0 MGD lime softening package unit and <br />all other equipment. Flow projections determined an additional 1.0 MGD package lime <br />softening unit and multimedia filters were required. Also the facility's raw water well supply, <br />lime feed systems, finished water storage, and high service were updated. <br />Water Treatment Plant Rehabilitation, Dania Beach <br />This project involved the complete renovation of the existing 3.0 MGD capacity lime <br />softening plant. The rehabilitation project included the replacement of filter valves, the rate <br />of flow controllers, a chlorination system, a lime mixing system, pumps, and vent filters. <br />The renovation of the treatment units included piping and instrumentation, cleaned <br />clearwells, and new plant electrical/ instrumentation controls. <br />Wells #9, #10, and #11, Pembroke Pines <br />CGA prepared the engineering study and design for the three wells. Permitting and <br />construction management were provided for the three Biscayne raw water wells and the <br />abandonment of two existing wells. <br />Brine Concentration Pipeline, Hollywood <br />The project involved the engineering design of the brine concentration pipeline for the City <br />of Hollywood water treatment plant upgrading. This 3.5 -mile pipeline will ultimately <br />transport 5.3 MGD from the Hollywood Water Treatment Plant High Services Pumping <br />Station. The design of this pipeline took into consideration the special requirements of <br />reverse osmosis and membrane softening, reject water including low pH from backwash <br />operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.