Laserfiche WebLink
Civil Works, Inc. <br />CW I Miami - Ft. Lauderdale - Orlando <br />A WBE /DBE firm 305 -448 -5955 954 - 344 -6568 407 - 339 -0040 <br />www.civilworks.com cwi @civilworks.com <br />JOSE M. ALDIR, E.I. GENERAL CIVIL <br />EDUCATION: Bachelor of Science in Geological Engineering - Colorado School of Mines <br />Associate of Arts in General Studies - Miami -Dade Community College <br />Special Courses Traffic Signal Timing Course using TEAPAC, PASSER, TRANSYT and <br />CORSIM - University of Central Florida <br />Six -week course in geologic mapping methods. Course work took place in the <br />Southern Colorado and Southern Utah areas. <br />S.T.O.P. Training for Supervisors, Seismic 3D Design Course, Land Seismic <br />Safety Training Course, Helicopter Safety, First Aid <br />PROFESSIONAL REGISTRATION: Engineering Intern, Florida <br />PROFESSIONAL AFFILIATIONS: American Society of Civil Engineers <br />EXPERIENCE: <br />Mr. Aldir has more than 10 years of engineering and geotechnical experience in the United States <br />and Latin America. He has prepared studies, conducted field investigations, prepared construction plans <br />and conducted field observation. His geotechnical experience assists in the knowledge of roadway and <br />utility design and preparation of construction documents. Mr. Aldir has been a Project Engineer (E.I.), <br />responsible for plan reviews in the following categories: water & sewer, drainage, roadway, traffic signals, <br />and paving & grading designs. His experience includes city ordinance research, engineering and site plan <br />design, plan submittals, and permitting. <br />Grand Avenue Improvements <br />This project included the design for the reconstruction of approximately 3,200 LF of roadway from <br />a 4 -lane undivided roadway to a 2 -lane divided roadway with the purpose of providing traffic <br />calming and improving the overall appearance of the area. Drainage, decorative street lighting, <br />brick sidewalks, landscaping, and sidewalk furniture were included in the project. <br />Walker Parking -FIU Signal <br />This project included the design of a driveway and new traffic signal for a new parking garage at <br />Florida International University along SR 90 (SW 8" Street) and SW 107" Avenue. <br />48" Force Main <br />This project required extensive researching of existing utilities within the area of a new 48" force <br />main along SR 826 between SR 5 (Biscayne Blvd) and the Intracoastal Waterway. This project <br />' included the development of a CADD file containing the location and identification of the existing <br />utilities. <br />Ives Estates Park Master Plan <br />This project included the Master Plan design for a new 84 acre park and regional office complex. <br />The project included recreational lighting, street lighting, parking lot design, and water and sewer <br />design. <br />County -Wide Bicycle and Pedestrian Facilities Study <br />This project included data collection, analysis, and construction cost estimates for the Metropolitan <br />Planning Organization (MPO) County -wide bicycle and pedestrian facilities study. <br />I� <br />ICivil Works, Inc. 10 NW 42 nd Ave., Suite 200, Miami, FL 33126 Ph: 305 -448 -5955 Fax: 305 -448 -5466 <br />