Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />,. <br />. <br />. <br />. <br />. <br /> <br />I: <br />. <br />. <br />. <br />. <br />:. <br />. <br />. <br />'. <br />I <br /> <br />PRELIMINARY ESTIMATE OF WORK EFFORT <br /> <br />Date: <br />Project Name: <br />Description <br />Consultant: <br />Department: <br /> <br />4/25/2007 Prepared By: Ed Palacio, PE <br />North Bay Road Bridge & Boardwalk <br />New Construction <br />Bermello Ajamil & Partners Team <br />Public Works <br /> <br />PRJ # 07-03-01 <br />FAP# N/A <br />Cty: City of Sunny Isles Beach <br />From: 174thStreet <br />To: 172nd Street <br /> <br />ACTIVITIES STAFF HRS CADD HRS <br />DESCRIPTION FROM TO FROM TO REMARKS <br />Project Management 480 600 <br />Roadway DesiQn 1400 1700 Includes drainaQe, utilities <br />Environmental PermittinQ 600 680 <br />Structural DesiQn 2900 3460 Includes concept studies and retaininQ walls <br />Public Involvement 160 200 <br />Landscape 1 Urban Desiqn 220 265 <br />Survey 1 MappinQ Services 200 260 25 Crew Days <br />Geotechnical Services 216 250 Includes permittinq requirements <br />Utility Locates Services 120 140 <br />Specialty Signage Services 200 245 Includes construction support <br />Post Design Services 360 440 <br />Construction Manaqement 5200 5720 Assuminq a 12 months construction duration <br />TOTAL 12056 13960 0 0 <br /> <br />STAFF DISTRIBUTION: <br />(Non,CEI Staff) <br /> <br />(%) Percent <br /> <br />Remarks <br /> <br />Project Manager 15% <br />Senior Engineers 10% <br />Enqineers 1 Architects 45% <br />Designers 1 Technicians 25% <br />Administration 5% <br />TOTAL 100% <br />