My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-03-01) General Engineering Services
>
Responses
>
Bermello Ajamil & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 9:53:18 AM
Creation date
1/27/2011 9:50:54 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Engineering Svcs.
Bid No. (xx-xx-xx)
07-03-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />,. <br />. <br />. <br />. <br />. <br /> <br />I: <br />. <br />. <br />. <br />. <br />:. <br />. <br />. <br />'. <br />I <br /> <br />PRELIMINARY ESTIMATE OF WORK EFFORT <br /> <br />Date: <br />Project Name: <br />Description <br />Consultant: <br />Department: <br /> <br />4/25/2007 Prepared By: Ed Palacio, PE <br />North Bay Road Bridge & Boardwalk <br />New Construction <br />Bermello Ajamil & Partners Team <br />Public Works <br /> <br />PRJ # 07-03-01 <br />FAP# N/A <br />Cty: City of Sunny Isles Beach <br />From: 174thStreet <br />To: 172nd Street <br /> <br />ACTIVITIES STAFF HRS CADD HRS <br />DESCRIPTION FROM TO FROM TO REMARKS <br />Project Management 480 600 <br />Roadway DesiQn 1400 1700 Includes drainaQe, utilities <br />Environmental PermittinQ 600 680 <br />Structural DesiQn 2900 3460 Includes concept studies and retaininQ walls <br />Public Involvement 160 200 <br />Landscape 1 Urban Desiqn 220 265 <br />Survey 1 MappinQ Services 200 260 25 Crew Days <br />Geotechnical Services 216 250 Includes permittinq requirements <br />Utility Locates Services 120 140 <br />Specialty Signage Services 200 245 Includes construction support <br />Post Design Services 360 440 <br />Construction Manaqement 5200 5720 Assuminq a 12 months construction duration <br />TOTAL 12056 13960 0 0 <br /> <br />STAFF DISTRIBUTION: <br />(Non,CEI Staff) <br /> <br />(%) Percent <br /> <br />Remarks <br /> <br />Project Manager 15% <br />Senior Engineers 10% <br />Enqineers 1 Architects 45% <br />Designers 1 Technicians 25% <br />Administration 5% <br />TOTAL 100% <br />
The URL can be used to link to this page
Your browser does not support the video tag.