Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br />CITY OF SUNNY ISLES BEACH <br />REQUEST FOR QUALIFICATIONS NO. 07-03-01 <br />NORTH BAY ROAD <br /> <br />SUNNY ISLES BEACH PEDESTRIAN & EMERGENCY VEHICLE BRIDGE <br /> <br />PRELIMINARY COST ESTIMATE SUMMARY <br /> <br />STRUCTURES <br />Short Span Flat Slab $ 1,139,110 <br />Medium Span Voided Slab (Preferred) $ 1,402,350 <br />Clear Spanning Girder $ 3,093,120 <br />Cable-Stayed Flat Slab $ 3,712,101 <br />ROADWAY $ 338,029 <br />BOARDWALK $ 167,461 <br />LIGHTING $ 118,476 <br />LANDSCAPING wi HARDSCAPE $ 150,000 <br />SUB TOTAL: $ 2,176,316 <br />MOBILIZA TION 10% $ 217,632 <br />MAINTENANCE OF TRAFFIC 2% $ 43,526 <br />M1T1GA T10N TBD <br />CONTINGENCY 15% $ 326,447 <br />TOTAL: $ 2,763,921 <br /> <br />Page 1 of 1 <br /> <br />ba <br />