My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-03-02) State Road 826/SIBlvd. Project
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 2:47:00 PM
Creation date
1/27/2011 2:45:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
State Road 826/SIBlvd. Project
Bid No. (xx-xx-xx)
07-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />defective material is fifty-feet either side of the failed sample. For materials that are <br />defective due to air voids, an engineering analysis is required. <br /> <br />334-6 Comparison Testing. <br />At the start of the project (unless waived by the Engineer) and at other times as <br />determined necessary by the Engineer, provide split samples for comparison testing with <br />the Engineer. The purpose of these tests is to verify that the testing equipment is <br />functioning properly and that the testing procedures are being performed correctly. In the <br />event that the Engineer determines that there is a problem with the Contractor's testing <br />equipment and/or testing procedures, immediately correct the problem to the Engineer's <br />satisfaction. In the event that the problem is not immediately corrected, cease production <br />of the asphalt mixture until the problem is adequately resolved to the satisfaction of the <br />Engineer. <br />If so agreed to by both the Contractor and the Engineer, the split sample used for <br />comparison testing may also be used for the Quality Control sample. The split sample used <br />for comparison testing will also meet the requirements for Independent Verification Testing <br />described in 334-5.7. <br /> <br />334-7 Method of Measurement. <br />For the work specified under this Section (including the pertinent prOVISions of <br />Sections 320 and 330), the quantity to be paid for will be the weight of the mixture, in <br />tons [metric tons]. <br />The bid price for the asphalt mix will include the cost of the liquid asphalt or the <br />asphalt recycling agent and the tack coat application as directed in 300-8. There will be no <br />separate payment or unit price adjustment for the asphalt binder material in the asphalt <br />mix. For the calculation of unit price adjustments of bituminous material, the average <br />asphalt content will be based on the percentage specified in 9-2.1.2. The weight will be <br />determined as provided in 320-2 (including the provisions for the automatic recordation <br />system) . <br />Prepare a Certification of Quantities, using the Department's current approved form, <br />for the certified Superpave asphalt concrete pay item. Submit this certification to the <br />Engineer no later than Twelve 0' clock noon Monday after the estimate cut-off or as <br />directed by the Engineer, based on the quantity of asphalt produced and accepted on the <br />Contract. The certification must include the Contract Number, FPID Number, Certification <br />Number, Certification Date, period represented by Certification and the tons [metric tons] <br />produced for each asphalt pay item. <br /> <br />334-8 Basis of Payment. <br />334-8.1 General: Price and payment will be full compensation for all the work <br />specified under this Section (including the applicable requirements of Sections 320 and <br />330). <br />Based upon the quality of the material, a pay adjustment will be applied to <br />the bid price of the material as determined on a LOT by LOT basis. The pay adjustment will <br />be assessed by calculating a Pay Factor for the following individual quality characteristics: <br />pavement density, air voids, asphalt binder content, and the percentage passing the <br />No. 200 [75 /-lm] and No.8 [2.36 mm] sieves. The pay adjustment will be computed by <br />multiplying a Composite Pay Factor for the LOT by the bid price per ton [metric ton]. <br /> <br />March 2007 <br /> <br />01000-66 <br /> <br />03-4122.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.